Documents for Business

In excess of 1,000 customisable documents covering every conceivable business issue.
Search all documents in Documents for Business
 
 

Method statement - installing MMMF insulation

Method statement - installing MMMF insulationBecause of the risks associated with working with insulation, e.g. manual handling, skin burns and irritation, breathing difficulties etc., you must identify the safe systems of work that your staff should... Read more
 
 

Process - safe system of work - connecting and disconnecting a 7kg-15kg butane cylinder

Safety procedure - connecting and disconnecting a 7kg to 15kg butane cylinderTo ensure that your staff follow prescribed safe systems of work, you should use a formal safety procedure. This document sets out how connecting and disconnecting a 7kg to ... Read more
 
 

Method statement - reinstating excavations

Method statement - reinstating excavationsBecause of the risks associated with removing materials from excavations, e.g. manual handling, the use of plant and machinery, working near the edge of the excavation etc., you must identify the safe systems... Read more
 
 

Method statement - paint stripping

Method statement - paint strippingBecause of the risks associated with stripping paint, e.g. manual handling, exposure to potentially hazardous substances, dust, debris etc., you must identify the safe systems of work that your staff should follow. ... Read more
 
 

Method statement - excavations over 1.2 metres

Method statement - excavations over 1.2 metresBecause of the risks associated with excavations, e.g. manual handling, trench collapse, service strikes etc., you must identify the safe systems of work that your staff should follow.  What to do?If you... Read more
 
 

Method statement - controlling dust on construction sites

Method statement - controlling dust on construction sitesBecause of the risks associated with dust generated on a construction site, e.g. breathing difficulties etc., it's vital that they are controlled.  However, in order for this task to be complet... Read more
 
 

Method statement - delivery of materials to construction sites

Method statement - delivery of materialsBecause of the risks associated with delivery vehicle movements, e.g. staff becoming trapped or run over, working in loading bays etc., you must identify the safe systems of work that your staff should follow.Â... Read more
 
 

Method statement - drilling into ceramic tiles

Method statement - drilling into ceramic tilesBecause of the risks associated with drilling into tiles, e.g. dust, flying debris, hitting a buried cable or pipe etc., you must identify the safe systems of work that your staff should follow.  What to... Read more
 
 

Method statement - drilling holes into concrete

Method statement - drilling holes into concreteBecause of the risks associated with drilling holes into concrete, e.g. manual handling, dust, noise, flying debris etc., you must identify the safe systems of work that your staff should follow.  What ... Read more
 
 

Method statement - drilling holes into wood

Method statement - drilling holes into woodBecause of the risks associated with drilling into wood, e.g. manual handling, dust, flying debris etc., you must identify the safe systems of work that your staff should follow.  What to do?If you're drilli... Read more
Download each file separately