Documents for Business

In excess of 1,000 customisable documents covering every conceivable business issue.

Introduction to this document

Flow chart - failure in lock out tag out process

If you operate a lock out tag out (LOTO) procedure there may be occasions when the process fails, such as keys being lost. Our flow chart helps you decide which course of action to take if there is a breakdown in the process.

What’s covered?

If you have a LOTO policy, it’s essential that you follow your commitments to control the risk of working with live electrical equipment. However, mistakes can be made or staff might abuse the padlock system so you will need to know how to act in a consistent manner to adhere to your policy.

Follow the steps and answer the questions until you reach the end of the flow chart. Here you will have two final instructions, the first being to ensure that the equipment is safe to put back into operation, and the second that your policy is reviewed to close any issues that may have been identified in the failure.